In the shield tunneling construction, the shield tunnel receiving method and the new construction method of the shield machine trolley crossing method were innovatively adopted, and the parameters of the water-rich gravel layer excavation and the mudstone stratum tube were summarized according to the different strata excavation. Technology such as on-chip floating control technology reduces the downtime of rectification due to technical quality problems.